Billionaire made superprofit on art PPP in Budapest

Journeying southwards in Budapest, venturing beyond the Petőfi Bridge on the Pest side of the Danube Embankment, for many years all one would find was a decaying freight depot. This changed when the so-called Millennium Quarter was built. A major component of the humongous construction performed by the TriGránit corporate group owned by the billionaire Sándor Demján was one of the largest and most expensive PPP projects pursued by the first Orbán government, the Palace of the Art, which the Hungarians tend to refer to by its acronym, Müpa. During the past decade, the annual costs of the Müpa project have consumed a quarter of the total public funding of Hungarian theaters and museums. The TriGránit subsidiary that operates the Müpa has amassed after-tax profits of 23 billion forints since 2003, while the taxpayers stand to lose as much as 168 billion forints based on the underlying PPP contract that will remain effective until 2035.

Together with the National Theater, the Müpa is part of a cultural center in the Millennium Quarter. Both mainstays of the cultural quarter were highly controversial investments. The National Theater was one of the pet projects of the first Orbán government. During the era of the coalition government made up of the Hungarian Socialist Party (MSZP) and the Alliance of Free Democrats (SZDSZ), wedged between the first (1998-2002) and second Orbán governments (2010-2014), the construction in Budapest’s Erzsébet Square was halted as part of the ongoing kulturkampf. Ultimately, it was realized in a different location, leaving its original location at the heart of downtown Budapest as a gaping hole for years. The theater building was erected by TriGránit’s construction arm, Arcadom. Following their successful public procurement bid, another TriGránit subsidiary, the Duna Sétány Székház Ltd., acquired the Müpa plot in 2000 for a sum of 2.385 billion forints.

The idea for the venue, which was originally planned to be the Museum of Modern Hungarian Arts, came from the cultural minister of the first Orbán government, Zoltán Rockenbauer. News reports at the time said that the billionaire TriGránit owner Demján was very taken by the idea. In 2000, the Fidesz government allocated 52 billion forints for the construction in its budget bill for 2001-2002, which were assigned to the legal predecessor of the Müpa, the Müpa Budapest Nonprofit Ltd. The funds were designated for the realization of the Millennium City Centre’s Cultural Block, in the form of a payment guarantee. In practice, this meant they were given the option of paying for the construction of a new cultural building in installments.

The amount was high considering that the initial plans had calculated with a construction cost of 31.3 billion. In other words, the cost of the project had increased by 20 billion even before construction had actually commenced. Initially, the plans were for a 10-year repayment period: the state would have funded the construction to the tune of 8-10 billion already at the start, and it would have paid off the remainder over ten years in the form of rental fees.

The initially projected 8% return on investment had climbed to 23% by 2018, however.

The reason was that in 2005 the Ministry of Culture, led by the MSZP politician István Hiller at the time, concluded a very unfavorable agreement: Following the pattern of the PPP contracts that were en vogue at the time, they signed a euro-denominated 30-year agreement, with the Hungarian state bearing the currency exchange risks. That turned out to be a very bad deal since the euro exchange rate, which stood at 243 forints in 2005, took off after the crisis. Compared with the current exchange rate of 330 for a euro, the forint has depreciated by almost a third since the contract was concluded.

Awful contractual terms 

Fidesz had lambasted the PPP contracts at the time with good reason, and now they found themselves in the awkward position of being the ones who ultimately launched the joint public private investment projects in Hungary, so they did not really attack the Müpa contract. Nevertheless, in a report compiled in 2012, the State Audit Office of Hungary put it unequivocally:

“The terms of the Palace of the Arts contract were ill-designed for an effective use of public funds, with the result that the interests of the state as the party commissioning the project were not well-served by the contract.”

It further noted that

“the operation and maintenance of the facility in the framework of the PPP project was economically inefficient.”

What makes the Müpa stand out among PPP projects is that apart from the highways, it is the most expensive project in terms of the state’s annual outlays on PPPs.

It is an undeniable that since the Palace of the Arts opened in 2002, it has emerged as a pre-eminent player in Hungarian cultural life. Not only in terms of quality, but also in terms of its costs: Between 2010 and 2019 the Hungarian state paid 109 billion forints in total for the Müpa, while it spent 290 billion on all other state theaters and museums combined.

Of the total state spending on all theaters and museums over the past decade, the Müpa received 27%.

Who was the real benefactor here: the billionaire or the generous taxpayers?

Naturally, the modern Müpa is an outstanding facility in Budapest, but whilst recognizing it as such we also need to acknowledge that other cultural institutions receive less funding as a result, which makes the underlying PPP investment seem like a grandiose and overpriced prestige project. And what makes it even more problematic is that it has generated stunning profits for Sándor Demján, who passed away in 2018 as one of Hungary’s richest men and relished the role of an arts patron.

One thing is certain: TriGránit and Demján (or his heirs after 2018) profited massively from this project. The Nemzeti Filharmónia Ltd., which operates the Müpa for the Hungarian state, has generated a revenue of 101 billion forints since the company was established in 2002.

Over a decade and a half, TriGránit has generated a stunning 23% rate of profit with the Müpa. 

According to our calculations, the TriGránit group that owns the company has amassed after-tax profits to the tune of 23 billion forints up until 2018.

It is worthwhile to juxtapose these figures with Sándor Demján’s generous philanthropic activities of which the late billionaire was very proud. He told Forbes in 2016 that he had spent nearly 20 billion on various philanthropic causes. Yet within the framework of this PPP project alone, he had amassed donations from the Hungarian taxpayers that exceeded this amount by 3 billion.

Another interesting tidbit in this context is that a quasi-offshore company, the Granit-Polus POA Investment Limited, which is registered in Cyprus, owns the company that operates the Müpa. At the time when it took over the reins of government, Fidesz had declared war not only on PPPs but on all public procurement commissions won by companies whose ownership arrangements were non-transparent. We turned to the Nemzeti Filharmónia Ltd and to TriGránit to inquire about the beneficial owners of the Cyprus-based company and to ask whether they believe that the extraordinarily high profits were fair, but we did not receive any answers. We also wanted to review the contract that governs the operation and maintenance of the Müpa, but once again TriGránit failed to respond and we were unable to find the contract on any online government platforms.

We would have been better off with government bonds 

We also calculated the amount that the Hungarian state will spend on the Müpa over a period of 30 years. However, without access to the contract and its terms, we had to rely on many approximations and estimates. Our resulting calculations suggest that at current prices, TriGránit stands to receive a total of 238.3 billion in availability fees until 2035 – and that’s merely the price for using the building, it does not include operating costs. Naturally, over such an extended period it does not make sense to compare expenditures for individual years, but we also adjusted the figure for inflation to try to gauge the amount in 2005 prices: adjusted for 2005 prices, the total bill would be “only” 146.3 billion.

But how much did TriGránit actually spend by comparison? Back in 2005, a press release by the Ministry of Cultural Heritage proudly proclaimed that the entire construction had cost only 31.3 billion. A sum of 2.4 billion had been spent on buying the plot of land, which lay unproductively fallow for years, and there were also costs associated with the financing of the construction work, so let’s assume a total budget of 40 billion. This yields a profit of nearly 110 billion forints. If the company did not finance the construction with its own cash reserves and resorted to borrowing instead – as was actually the case – then we need to subtract the interest they paid from these 100 billion – as the 23% rate of profit illustrates, there was ample room for repaying the interest.

We also estimated what would have happened if the state had simply chosen to fund the project itself, by borrowing and increasing the public debt. Our estimate is that at current prices, the total cost would have been 58.5 billion, but adjusted for 2005 prices the Müpa project would have cost the taxpayers only 39.8 billion.

Thus, our calculations suggest that at 2005 prices the state lost 106.5 billion forints by paying the TriGránit group for the Müpa construction over a period of 30 years in the framework of a PPP contract rather than funding the project itself by way of public debt. 

 But there is also another major problem with the PPP contract. Theoretically, the contract ends only in 2035, but it is possible that this will require an amendment of the relevant law. In the budget for 2005, the National Assembly had authorized a total spending limit of 97.9 billion for this project. At gross value, this limit has already been exceeded, but even the net value will be breached by 2023.

Since the Nemzeti Filharmónia Ltd. has no other function or responsibilities apart from maintaining and operating the Müpa, for all intents and purposes the underlying contract is a gift awarded to it by the state – one that keeps generating stunning profits even without any special effort on behalf of the recipient. Incidentally, the relevant rate of profit is twice as high as what the mainly German and Austrian owners of the M5 and M6 highways have been able to extract from their PPP contracts for these highways.

This article was written by Peter Bucsky, and was first published on g7.hu, DemNet’s media partner, with the goal of presenting the problem with PPPs to the Hungarian readers and raising awareness about it in the wider public. Read our other article on how Hungary lost 7% of its GDP due to four highway PPPs here.